Next Public Hearing: October 20, 2026, 1PM, City-County Building Public Assembly Room — Indianapolis BZA Division III
Not working? See Email Template
Subject: Please Connect the Pennsy/Blue Line to Panda Express—2026DV3031
To: Robert.Uhlenhake@indy.gov, wtda.warren@gmail.com, michael@michaelpaulhart.com, advocacy@centralincycling.org
Dear Robert,
I am writing regarding case 2026-DV3-031 to ask that the project include commitments to create a connected pedestrian network between Washington Street, the proposed Panda Express, the existing strip mall, and the Pennsy Trail.
Connecting these sites is a sensible way to ensure accessibility, protect future connectivity, and make the development more consistent with Indianapolis’ Complete Streets and TOD goals.
I ask that the petitioner commit to:
- Connecting the Pennsy Trail to the Washington Market parking lot.
- Providing an ADA-accessible curb cut connecting the existing strip mall to the pedestrian network.
- Creating a pedestrian trail along the western property line, connecting Washington Street to the rear of Lot 2.
- Working with the appropriate agencies to pursue construction of a shared-use path along Washington Street from the property to the signalized intersection, subject to agency approval and permitting.
- Providing enhanced landscaping, including trees, along pedestrian routes and the site frontage.
- Adding safety measures between Washington Street and the Panda Express frontage, such as a raised crosswalk, appropriate lighting, and signage, while minimizing pedestrian/vehicle conflict points.
These improvements would create a more connected and accessible site while addressing the pedestrian impacts of the proposed development and the requested zoning variances.
Thank you for considering these requests.
Thank you,
[Your Name]
[Your Address]