Demonstration Projects

The City of Indianapolis’s Community-Powered Infrastructure Program creates opportunities for communities to shape their streets.

2027 project applications were due by Sept 25th, 2026.

Community-Powered Infrastructure (CPI)
Community-Powered Infrastructure

You Can Change Your Street

We help community-based organizations and passionate neighborhood activists build their vision. Do you have an idea or questions?

Contact Us
Traffic Calming Speed Hump - Rubber bolt down type
Traffic Calming

How to request a speed hump?

Indy DPW Street Change Policy: Residents and/or neighborhood associations can request changes affecting their streets such as parking changes, travel direction, and the installation of speed humps with a Street Change Petition.

The current policy requires a petition with signatures from 75% of the affected property owners. When that petition is submitted, it spurs an Indy DPW speed and traffic study. To justify a speed hump installation, they require an 85th percentile speed of 35 mph or higher. — What is the 85th Percentile Speed?

If you need assistance or have questions, you can Contact Us.

Indy Street Change Petition
Safe Trail Crossings

52nd Street & Monon

Sept to Oct 2025 – We worked with a local resident (Liz) that was tired of people being hit by drivers while crossing 52nd St at the Monon Trail crosswalk. The project included water-barriers for traffic calming, painted curbs, protected bike lanes, and temporary rumble strips before the trail crossing.

In addition to a safer Monon Trail crosswalk, the project reduced speeding through the nearby S-curve, making it safer for neighbors to pull out of driveways and side streets – including the nearby Montessori school.

Results – This project reduced the 85th percentile speed by 4 mph (27 mph – 23 mph) and improved safe yielding behavior by 12%.

Read Article
More Bike Parking

Little Flower Neighborhood

2025 – We assisted Little Flower Neighborhood Association with their curb extension and daylighting project by sharing our rental moving truck and ordering, delivering, and permanently installing bike racks.

Read Article
46th St and Monon Trail Safety Demonstration Project Collage
Safe Trail Crossing and Park Access

46th Street & Monon

August through October, 2026 – Nearby neighbor, Taylor, worked with Central Indiana Cycling and 66 volunteers to demonstrate a safer crosswalk for the Monon Trail at 46th Street. Additionally, traffic calming water barriers kept drivers from passing at high speed in the center turn lane near the baseball fields and Arsenal Park. The bike lanes along 46th St were protected with white delineators (tall cones) and water barriers.

Report and Recommendations

Read Article
Volunteer Group pre-install safety chat at 16th St and Monon Trail safety demonstration project
Mural art in the 16th and Monon Trail safety demonstration project bump outs
Full bicycle racks at Solely Wine during the installation of the 16th St and Monon Trail safety demonstration project
Safe Trail Crossing

16xMonon

May through October, 2026 – The 16th Street and Monon Trail safety demonstration project has involved over 100 community volunteers.

After neighbors built it, 16th & Monon became kinder, slower, and easier to trust. More people cross. Drivers yield. The dangerous moments nearly vanished, and the data carries the feeling.

Reduced speeding at the 16th St and Monon Trail crosswalk

View Results
Safer Business Districts

10th Street at the Emerson Theater

September through November, 2026 – We assisted the 10th Street Emerging Cultural District with their traffic calming installation by providing materials, volunteers, and marketing.